After originally concealing any mention of a biomass plant on the flyer delivered to some local residents on 1 June 2021, MASG has finally uploaded indicative details of 2 possible options which it says are being considered for a pyrolysis / gasification plant: 

However, MASG has provided no evidence to show that either of these options have been constructed and put into operation in any other comparable facility or location.

Option 1 appears to be based upon a trial facility at the Loganholme Waste Water Treatment Plant in Qld which turns human poo into power:

https://www.pyrocal.com.au/biosolids-to-energy

Option 2 is a small scale demonstration facility at Pyramid Hill 86km north of Bendigo not even available for visit until September 2021:

https://yoursay.advancedenergytech.com.au/home/demofacility

Both options incorporate chimney stacks described as being potentially up to 10m high but these are not shown on the proposed facility layout.

MASG is also at pains to stress that the plant will be safe as it will only accept clean uncontaminated waste which requires it to be correctly separated and sorted at the point of collection. However, MASG has provided no evidence to show how this would be checked at the point of delivery to the Castlemaine facility saying “Once collected, we will have little knowledge of the source location of whats (sic) in the truck”.

And this image is straight from the Pyrocal website: 

MASG also says: no toxics in = no toxic emissions

However, logic dictates this also means: toxins in = toxic emissions out

MASG admits that the biomass facility will process “unrecyclable quarantine cardboard” and potentially some “unrecyclable quarantine polyethylene plastic” from Dons imported meat products but claims that no other plastics, mixed waste or toxic waste will be received. 

How can MASG guarantee that no contaminated/toxic waste will be processed through the facility?

How would MASG even know the exact content of the waste that has been delivered to the facility and what safety procedures are in place to manage and mitigate the risks from such a potentially hazardous event?

MASG says it has been progressing this project for the last 3 years so why has the design of such a fundamental component of the facility still at feasibility stage?