CRAB news – Bioenergy project update, George Weston Foods due in court and more! 

We were pleasantly surprised to read Council’s Draft Waste Management Policy with its focus “to reduce waste to landfill, increase the rate of reuse and recycling, and maintain a high level of community satisfaction in line with evolving legislative requirement.”  

However, it’s a pity that the Climate Strategy Plan developed by the Wararack Initiative (stacked with MASG representatives and members regardless of conflict of interest) for Council is delusional in its support of the proposed Mount Alexander Bioenergy waste to energy facility which it justifies on the basis of flawed carbon accounting figures. The proposal clearly contradicts and undermines Council’s commitment to community support and transition to a circular economy and has no place in the Plan.

It also seems that the Wararack Initiative is unaware that the future of the proposed Byron Shire bioenergy facility is uncertain having been rejected for federal funding. 


George Weston Foods due in Court 

George Weston Foods Ltd (GWF) is due to appear in Castlemaine Magistrates’ Court on 28 July 2023 at 9.30am following upon its 2 years undertaking to be of good behaviour after being convicted for polluting the creek at the Don KR factory.

We hope that GWF’s ongoing breaches of regulatory noise limits at the factory will be raised with the Magistrate by the EPA along with GWF’s failure to declare a conflict of interest with MASG when GWF selected MASG to be the recipient of the $100,000 fine for its regenerative agriculture project despite their joint involvement in the proposed bioenergy facility at Don KR.

We also hope that MASG’s expenditure of these monies is carefully scrutinised given that it appears one of its own Committee members has been appointed to head the project on a paid contract from the funds.  


Don KR Planning Applications and Related Matters

Mount Alexander Shire Council approved the planning application for George Weston Foods’ proposed 3.5 MW solar energy facility on zoned farmland next to the Don KR factory at the meeting on Tuesday 20 December 2022 (p43-59) and subsequently issued a Planning Permit.

However, apparently no-one from Council noticed that the Applicant (p51) was named as George “Western” Foods not George “Weston” Foods leaving the legality of the permit in doubt.

The project has also not been referred for assessment as required under the terms of the EPBC Act despite requiring clearance of high conservation native vegetation and its detrimental impact on threatened species with a significant loss of biodiversity. 

George Weston Foods has failed to comply with Improvement Notices issued by the EPA for significantly exceeding noise level limits at the Don KR Castlemaine factory site. The company has now been granted an extension by the EPA to 31 October 2023 for compliance after it requested yet more time.

The factory also continues to operate almost at will without a Council permit for night time / overnight hours of operation despite causing noise pollution, light pollution, traffic impacts etc. with significant adverse impacts on the health, safety and welfare of local residents and native wildlife including threatened species such as the Eltham Copper Butterfly.

At the most recent Council meeting on 20 June 2023 (p91) it was reported that during the period from 17 May to 20 June 2023 the CEO had a “meeting with DonKR and George Weston Foods representatives to discuss upcoming planning permit application“. We look forward to open and transparent community consultation when the company decides to tell us what they are going to do!


Froome’s Road Bridge

Mount Alexander Shire Council approved an alternative motion to rehabilitate and strengthen Froomes Road Bridge along with pedestrian and road safety measures at the meeting on Tuesday 20 December 2022 (p29-42).

However, it appears that the required funding for the works has not been included in Council’s current budget. Meanwhile the road surface continues to deteriorate, Don KR traffic continues to speed through and litter the area, heavy goods vehicles continue to use the bridge and promised speed reduction / traffic calming measures have not been implemented.

The road toll on native wildlife continues to mount including the recent death of a threatened brush-tailed phascogale. 


Pig Welfare

After broadcasting shocking footage on 7.30 the ABC now reports that the Victorian parliament is to hold an inquiry into pig welfare following alleged abattoir break-ins

There’s nothing ethical about a company which is responsible for factory farming and gassing pigs. However, importing thousands of tonnes of cheaper pork from Canada under Australian Government biosecurity arrangements which may contain toxins and pathogens and has lower animal welfare standards than Australia is probably worse.


Biomass Delusion Statement

Castlemaine Residents Against Biomass is one of over 200 world-wide signatories to the Biomass Delusion position statement.

We recently accepted an invitation to become a member of the International Biomass Working Group which provides us with even better access to shared information, network with other organisations from all around the world, stay informed of current issues and collaborate on campaigns to protect forests and stop big biomass. As a bonus, it also boosts our profile on the world stage where we are hopefully punching well above our weight!

CRAB news update – FOI documents and more! 

Bioenergy Project FOI Documents

We have just received a significant number of documents released under FOI in relation to Mount Alexander Bioenergy’s $100,000 publicly funded Bioenergy Infrastructure Fund grant.

There is a lot of information to take in but the first thing that struck us was our description by MASG on its Permission Pathway Form to the EPA as “a small group of NIMBY protagonists”. Not a very professional look from a group that claims to highly value community relationships!

MASG even claims to have overwhelming community support including local residents (except for 4 households), the majority if not all of the Shire’s Councillors, Castlemaine Rotary (with 3 Councillors serving as Office Bearers) and Castlemaine Health. Not many conflicts of interest there!



MASG must be completely delusional, or making more false claims, if it believes its submission that only 4 households oppose the project.



The Wastewater Effluent Treatment document reveals that the site would be turned into a stinking sewage treatment plant with the addition of an industrial effluent treatment system including a huge 60m x 60m x 4m stabilising lagoon where it will be “naturally polished” for 12 months before Coliban Water will accept the discharge as trade waste.

MASG also admits that it has failed to secure a financier and is looking for Angel Investors to fund the project. That will be highly challenging given the complete lack of a social licence and multiple risks associated with the project including the prospect of legal action.

These documents are in addition to correspondence previously released in March 2022 under FOI by the Australian Government – Department of Agriculture, Fisheries and Forestry regarding Mount Alexander Bioenergy seeking approval to dispose of imported pig meat waste through its facility. This correspondence published on the Department’s disclosure log revealed that a “formal legislative approval of a proposed arrangement is not possible until the facility is built and audited for compliance with the conditions of the proposed arrangement“.

Who would invest in a project with such significant financial risks?


Don KR Planning Applications and Related Matters

The planning application by Don KR / George Weston Foods for its proposed 3.5 MW solar energy facility on zoned farmland is now under review and we are expecting it to be determined by Council at the next meeting on Tuesday 20 December 2022.

Having failed to comply with the previous Improvement Notice issued on 8 February 2022, the EPA issued a further Improvement Notice to George Weston Foods on 12 October 2022 for continuing to exceed noise limits at the factory. Council has admitted that the factory does not have a permit for night time hours of operation and is relying on 15 years existing use rights for a facility that has not existed for that length of time.


Froome’s Road Bridge

We understand that Mount Alexander Shire Council will determine the future of the Froomes Road Bridge at the next meeting on Tuesday 20 December 2022. It’s going to be a busy meeting and the Agenda containing all the recommendations is not due to be made available until 3 business days before the meeting!

This is despite refusing to release the independent consultant’s report which was provided to Council in August. We are aware however that opposition to a two-lane concrete replacement was clear in the community feedback with 85% expressing concerns.

It is also clear to us that the replacement bridge is being touted by Council in order to facilitate access by trucks potentially including B-doubles and other vehicles to the Don KR factory at Richards Road.  

Council has wilfully neglected proper maintenance of the bridge over recent years but now has the perfect opportunity to retain the heritage values of the bridge and natural character of the surrounding area and ensure the safety of local residents by restricting use to local traffic.

To that end we would also encourage you to nominate the bridge for heritage protection under Council’s current review. Suggestions for potential sites of heritage significance close on Sunday 18 December 2022.

https://www.mountalexander.vic.gov.au/Page/Page.aspx?page_Id=4439&h=0


Class Action Update

We now have a considerable amount of evidence in support of our Class Action should MASG proceed with the project.

You can still join us by emailing your contact details in confidence to:

legal@wearecrab.org

We are anticipating that this would be run on a “no win no fee” basis with no financial risk to class action group members.

CRAB campaign update, powerful owls and more! 

Bioenergy Project Update

Mount Alexander Bioenergy (MAB) has just released updated plans on its website for its Bioenergy from waste facility in Castlemaine, a proposal which has been discredited by experts in the field such as Dr Duncan Rouch with plans for a similar proposal recently rejected by City of Greater Bendigo Council.

However, nothing has changed when it comes to repeating the same old falsehood that the project is “community-led” when it has in fact been developed in secret over several years and the site selected in a highly dubious process with no public consultation.

MAB now says that “the Bioenergy project will continue in a staged approach, with the development of the proposed twin technology bioenergy facility to focus on developing an Anaerobic Digester (AD) plant first and foremost” with “the Biomass plant to be revisited when the AD is operational.”

This approach is at complete odds with the aims of the Victorian government’s $515m reform of the recycling system to minimise waste by maximising recycling and composting and creating a genuine circular economy.

Contrary to being “safe” as claimed, explosions, fires and asphyxiations at bioenergy plants have caused multiple deaths worldwide as a Google search or look at our Resources website page will confirm.

Coincidentally, a new ABC news article on waste-to-energy reports that Australia’s Waste Management and Resource Recovery Association supported reuse options like FOGO as the preferred option for the country’s waste woes. “The goal has always got to be to try and keep valuable resources circulating in the productive economy rather than using it once for energy,” said CEO Gayle Sloan.

“Our soil is probably the most diminished from a nutrient point-of-view that it’s been in history. So getting that goodness out of the food and the garden organics and putting it back into the soil and improving its quality is a very good higher order use.”

She said while waste-to-energy had its place, it should only happen with materials that could not be recovered or recycled.

The figures on the Mount Alexander Bioenergy website regarding savings in emissions are grossly inflated and unsubstantiated and seem to be based on the false premise that all waste is destined for landfill instead of being recycled or composted.

The figures also contradict Mount Alexander Shire Council’s own information and appear to exclude emissions from constructing, operating and de-commissioning the proposed facility, transport emissions, methane emissions from the wastewater lagoon etc.

The claimed savings in emissions are completely disingenuous as they include landfill avoidance in other Shires as a result of transporting waste into Castlemaine from all over Central Victoria effectively turning our town into an industrial dumping ground.
 
Mount Alexander Bioenergy claims that its proposal will reduce CO2 emissions by 88,500 tonnes per annum however Mount Alexander Shire Council’s Roadmap to Carbon Neutrality 2020 – 2025 shows that CO2 emissions from waste were 10,600 tonnes in 2018 and forecast to reduce to only 1,615 tonnes by 2025. And that’s without any need for a bioenergy facility!

The website fails to specify any risks such as fire, explosion, toxic emissions, noise, odour, increased truck movements, adverse impacts on threatened species such as the Eltham Copper Butterfly etc.  

It also falsely promotes the proposal as generating clean energy when it even intends to process quarantine waste from imported pig meat including plastics and cardboard packaging which may contain pathogens. This is in addition to animal waste from a major chicken processor and potentially even biosolids arising from Coliban Water’s sewage treatment system. Not much in the way of clean, green energy there! 

There is no substantiation or independent verification of the dubiously claimed benefits such as emissions reductions, reduced noise and odour, jobs security, cost savings to local ratepayers, profits to community etc.

Is MAB aware that the competition watchdog and corporate regulator have begun a crackdown on “greenwashing” by Australian companies, surveying the internet for companies making false claims about environmental action after a global investigation found as many as 40% may be fraudulent?

CRAB will therefore continue to oppose the project by every legal means at our disposal in order to hold the proponent to account should it  proceed with its proposals.

MASG Annual General Meeting   

MASG has just posted details of its AGM be held on Thursday 17 November 2022 at Senior Citizens Hall, Mechanics Lane, Castlemaine, at 7.30pm

The Agenda and 2021/22 Annual Report together with the Minutes of last year’s AGM are also available at the same link on MASG’s website.

MASG says: 

“And, after the formal meeting, there will be a presentation on the Mount Alexander Bioenergy Project, which we hope can make a great contribution towards reducing the Shire’s greenhouse gas emissions. Mick Lewin and Deane Belfield will provide an update on the status of the project and the likely next steps.”
 
“In order to expedite the facility development, we have decided to seek approval only for the Anaerobic Digester (AD) stage of the project initially. This type of facility is widely used locally and worldwide and can therefore be expected to come into operation more quickly and start to reap the benefits to the community in 2023.”
 
“The Biomass (pyrolysis/gasification) plant will be approached afresh once the AD is in operation.”


MASG says the meeting is open to everyone although only members can vote. 

The 2021/21 Annual Report is extremely revealing as it shows on pages 12 and 18 that two MAB people (Mick Lewin – Chair of Board and Deane Belfield – Project Manager / Renewable Energy Consultant) are being paid remuneration by MASG (of which they are both also general committee members).

The report also contains further details of MASG’s benevolence to its own committee members saying Mick Lewin is to be paid a further $50,000 if and when the bioenergy project reaches financial close and Deane Belfield’s company ECO2Sys is to be paid $142,000 (plus GST) subject to the condition that payment will only be paid if, and when, funding becomes available that would permit such payment. 

Don KR Planning Applications and Related Matters

Council is currently reviewing Don KR / George Weston Foods’ planning application PA359/2021 for its proposed 3.5 MW solar farm, re-branded as a solar array.

There is also a new planning application PA266/2022 for “Buildings and works to upgrade existing car park” at 66 Richards Road, Castlemaine.

We are also still awaiting an update from the EPA regarding the Improvement Notice issued  to George Weston Foods for exceeding overnight noise limits at the factory. Council has admitted that the factory does not have a permit for night time hours of operation and is relying on 15 years existing use rights for a facilty that has not existed for that length of time.

On a related matter, a white transit van with Council’s new logo on the side and a Don logo on the side door has been witnessed travelling through town and parked outside the factory site. 

Can Council please keep us informed by providing a full explanation e.g. is Council providing in kind and/or financial assistance for transporting Don KR employees, are other Council services being compromised and how is Council managing this conflict of interest?  

Froome’s Road Bridge

Mount Alexander Shire Council closed the Froomes Road Bridge “for inspection” after the recent floods although the bridge itself was not under floodwater and the only new flood damage visible is the breaking up of the road surface which has been an ongoing issue for a long time due to lack of proper maintenance.

We trust that Council is not using the flooding as a convenient excuse to replace the historical bridge with a new two lane bridge which would destroy the heritage values of the bridge, ruin the character of the surrounding area and put local residents at risk from increased heavy vehicle traffic to the Don KR factory in Richards Road?

The closure of the bridge certainly made for a more peaceful and safer neighbourhood and highlighted that the Don KR factory generates most of the traffic that uses it including the recent unlawful and dangerous use by a B-double truck.

Council now has the perfect opportunity to formally recognise the significant heritage values of the bridge by listing it under its current review of heritage protections.

Powerful Owls

We’re extremely happy to report that the threatened powerful owls have two new chicks and trust that Council will provide them with every protection necessary for their survival.

CRAB campaign update and more!

It’s been over 4 months since our last news update on the proposed Mount Alexander Bioenergy facility so we thought it was about time to bring the issue back into focus.

It may not be obvious but we are still working hard behind the scenes in our continuing efforts to have the proposal scrapped.  We are pleased to see that there is a groundswell of world-wide opposition to biomass plants by environmental organisations and that new facilities are now prohibited in an increasing number of jurisdictions including ACT and a newly proposed restriction to 4 designated precincts in NSW. Here in Australia, and Victoria in particular, more and more Councils are starting to recognise the significant risks and downsides of waste to energy projects which undermine recycling and have been falsely promoted as providing clean, green, renewable energy as a panacea to landfill. 

False claim by MASG on Biomass Delusion Statement

The Castlemaine Mail finally published a correction on 8 April 2022 to MASG’s false claim on the Biomass Delusion Statement and a copy can be viewed below – apologies for the poor quality!

However, in the interests of so-called balance, the Editor posted further disingenuous claims by MASG regarding the feedstock for the proposed facility which are contradicted by information on its own website. 

This shows that the facility intends to process contaminated plastic packaging of imported pig meat (which may contain pathogens) from Don KR together with forest timbers such as woody waste from sawmills, sawdust and other industrial sources of timber waste.

To that end, MASG is seeking to obtain permission from the Commonwealth Government under the Biosecurity Act in order to use contaminated waste from imported pig meat products in the proposed facility. However, who would risk investing in a facility when we understand that no such approval will be considered until the facility is operational?   

Independent Review into Castlemaine Bioenergy Project 

The Independent Review into the project by Dr Duncan Rouch has just been updated after new information on climate change and now recommends the omission of the anaerobic digester as well as the biomass plant. Not much argument from us on that!

New MOU between Mount Alexander Shire Council and MASG

At the Council Meeting held on 15 March 2022 (p10) Council authorised the CEO to sign a Memorandum of Understanding (p5) between Mount Alexander Shire Council and Mount Alexander Sustainability Group for a period of 5 years. However, not one Councillor questioned the obvious conflict of interest let alone how or why the MOU was backdated to start from 1 July 2020. 

Don KR Planning Applications

In an update to our previous news about two separate planning applications by Don KR / George Weston Foods, Council has recently approved the signage application and is now advertising (p33) the proposed 3.5 MW solar farm, re-branded as a solar array.

The solar array comprises 9,400 solar panels mounted on tracker panels 4.58 m high to be located on 6.16 hectares of land in the Farming Zone to the north-west of the factory. The entire area of the solar array is to be enclosed with 2.1 – 3m high chainlink mesh security fencing topped with 3 strand barbed wire and monitored by 4 security cameras. Up to 17 trees, including 5 large trees, are proposed to be removed within the designated solar array area. There is no indication of how much power will be generated as a proportion of the factory’s current consumption and it also appears to be in addition to the proposed bioenergy facility. 

Don KR claims that an EPA licence is not required and that it does not have to comply with the Solar Energy Facilities Design and Development Guide August 2019 as it will “mainly supply energy to an existing use on the land on which it is located.”

This is despite ongoing noise issues with the factory which is subject to an Improvement Notice issued by the EPA for exceeding overnight noise limits. Council has admitted that the factory does not have a permit for night time hours of operation and is relying on existing use rights.

NB The compliance date has now been extended by four weeks to 28 July 2022 upon a request by the duty holder who “was able to demonstrate to EPA that the factors that lead to the request were beyond their control.”

True to past form, there has been no community consultation, no evidence was found of threatened species and there is no supporting documentation on fundamental issues such as traffic impacts, noise from pile driving and other construction works from 6.00 am to 6.00pm, glint and glare assessments, bushfire management plans etc. etc.

Full details of the solar array application and on-line objection / submission lodgement process are on Council’s Greenlight Planning Register.

Submissions must be made before 19 July 2022.

Froome’s Road Bridge

Mount Alexander Shire Council has engaged an independent consultant to carry out consultation into the future of the historic one-lane Froome’s Road Bridge and a community forum took place on 27 June 2022, albeit with only 5 day’s notice.

Council claims that the bridge is “approaching the end of its lifecycle” but has provided no evidence to substantiate its claim. Our community has made it clear that we are totally opposed to a new two lane bridge which would destroy the heritage values of the bridge, ruin the character of the surrounding area and put local residents at risk from increased heavy vehicle traffic to the Don KR factory in Richards Road.

Fire, explosion and chemical toxicity hazards of gasification energy from waste

Mount Alexander Sustainability Group (MASG) can never claim that it was not given ample warning about the potentially catastrophic risks and hazards of its bioenergy proposal.

For example, this research paper provides the following abstract:

“In recent years there have been an increasing number of attempts to develop commercial-scale gasification of municipal solid waste. The results have been widely disappointing, with many high profile and often catastrophic failures. The causes and analyses of these process failures remain inadequately reported in peer-reviewed literature. This paper identifies and discusses these hazards in the context of modern preferences, using case studies and historic antecedents to explore the engineering challenges which underpin loss prevention in the gasification energy from waste sector. It shows that there are many hazards: flammable, toxic, and corrosive gas mixtures, the auto-ignition of stored feedstocks, multiple explosive atmospheres due to both overpressure and underpressure combined with many ignition sources, plus heightened risk at times of start-up, shut-down or during testing. It also identifies how risk is heightened by preferences for novelty, lack of stakeholder understanding, a desire to operate at high outputs, and a reluctance to learn from history.”

Rollinson, Andrew. (2018). Fire, explosion and chemical toxicity hazards of gasification energy from waste. Journal of Loss Prevention in the Process Industries. 54. 10.1016/j.jlp.2018.04.010.

We consider that this paper is so important that it should be read by everyone who has an interest in or may be affected by the proposed Mount Alexander Bioenergy facility.

There are numerous examples of explosions which have led to fatalities at bioenergy facilities including the deaths of four people at a waste water treatment works in December 2020 at Avonmouth in the UK.

The blast happened in a silo containing biosolids which are “treated sludge”, a by-product of the sewage treatment process. According to Wessex Water, the sludge is treated in anaerobic digesters, oxygen-free tanks, to produce agricultural fertiliser and renewable energy.

https://www.bbc.com/news/uk-england-bristol-55173667

MASG would be well advised to listen to the sage advice of Edmund Burke:

“Those who don’t know history are doomed to repeat it.”

False claim by MASG on Biomass Delusion Statement

In an article in the Castlemaine Mail on 24 December 2021, Mick Lewin, Chair of Mount Alexander Bioenergy said in response to the latest statement from CRAB that MASG fully endorses the Biomass Delusion Statement and has done so by adding its name to those on the website.

We have subsequently been informed by the world-wide Environmental Paper Network that MASG is making a false claim because they were not accepted as a signatory to the Biomass Delusion Statement. They have been contacted by Peg Putt* of the Environmental Paper Network to ensure that they remove this claim from anywhere they have made it. We have been informed that it is certainly not the intent of the Environmental Paper Network to have bioenergy industry representatives sign up to the Biomass Delusion position statement and that there is no way the Network wants to be part of MASG’s greenwashing effort.

* Peg Putt is an environmental activist renowned world-wide for her leadership including as former leader of the Tasmanian Greens, CEO of Markets for Change and current position as Coordinator – Policy, Campaigns and NetworkingForests, Climate and Biomass Energy Working Group for the Environmental Paper Network.

The Position Statement on Forest Biomass Energy and full list of endorsed signatories, including Castlemaine Residents Against Biomass, is on Environmental Paper Network’s website https://environmentalpaper.org/the-biomass-delusion/

The article is not available on-line but a scanned copy can be viewed here:

Wastewater polishing lagoon covertly added to bioenergy proposal and more! 

Shortly after our media release last month, Mount Alexander Bioenergy revised the Q+A document on its website (yet again) in a futile attempt to undo the damage inflicted when we highlighted the folly of its proposal on the global stage.

Our campaign also made the hallowed pages of the Castlemaine Mail, albeit in truncated form, due to the paper’s need to provide balance by giving MAB an equal amount of space to provide a desultory reply.

But the attempt backfired and the organisation only made matters worse by revising, without announcement, the proposed facility layout. A vast new wastewater polishing lagoon has now been added making the facility look increasingly like an industrial sewage treatment plant on top of the highly hazardous chemical processing facility. The purpose of the lagoon is apparently to hold raw sewage, including animal waste, in a pond until it “stabilises” before discharging the effluent into the creek.

The EPA defines the polishing stage as:

“Treatment stage used to upgrade the standard of effluent discharge. Its purpose is to reduce the residual solids in the effluent and the biochemical oxygen demand associated with such solids.” 

and stipulates that:

“Wastewater treatment plants need to be located in areas remote from residential development with sufficient available land for sustainable wastewater reuse.”

The lagoon would be an environmental nightmare with all sorts of risks such as odours, release of methane gas, potential contamination to ground water, breeding ground for mosquitoes etc. in addition to the potential impact on our waterways.

It appears that Mount Alexander Bioenergy is so embarrassed by such a putrid inclusion that the entire document was quickly taken offline.

However, we downloaded a copy before it disappeared and you can see the extent of the works here:



 
The layout still fails to show other facilities we expect to be required for the facility including the chimney stack for the biomass plant, outside storage for biomass feedstock and a potential on-site woodchipper.

This information has also been brought to the attention of Mount Alexander Shire Council at the last Council meeting on 21 December 2021 with the Director Infrastructure Development (DID) responding to questions as follows:

“Council has not received a planning application for the bio-energy facility. DID advised that there had been preliminary discussions with Statutory Planners and also noted that as with all planning applications, the applicant will go through a process of public notice as required by Councils statutory requirements.”

Council failed to reply to a question asking if it had entered into any discussions/negotiations/agreements with any other parties such as City of Greater Bendigo Council regarding the collection of waste from outside Mount Alexander Shire for processing in the proposed Mount Alexander Bioenergy facility and, if so, can Council please provide a summary of them.

Given all the above, surely even the most ardent supporter of Mount Alexander Sustainability Group can see that the facility stinks and would take Castlemaine back to the dark days when live animals were trucked into town and slaughtered on site.  



In further news, Don KRC / George Weston Foods made two separate planning applications just before the Christmas holidays, perhaps in the hope that nobody would notice?

These are noted on Council’s Greenlight Planning Register as follows:



According to Council these applications will be publicly advertised but we have been unable to ascertain when this will happen.

We have no further information and it is unclear to us if the proposed solar farm is in addition to, or instead of, the proposed bioenergy facility. 



You may also have noticed that we are seeking Expressions of Interest for a Class Action against Mount Alexander Sustainability Group should it proceed with its proposed Mount Alexander Bioenergy facility at Don KR in Castlemaine.

Please email your contact details in confidence to:

legal@wearecrab.org

We are anticipating that this would be run on a “no win no fee” basis with no financial risk to group members.



In other news, Mount Alexander Shire Council released details last month of the Wararack Initiatives saying on its website:

“On Thursday the 9 December Council and community released the Wararack Initiatives at Djaara Park/Victory Park: to work collaboratively on a ten year Community Transition Plan addressing climate adaptation, cultural renewal and zero net emissions by 2030.”

It seems more than coincidental that this newly launched group of apparently self-appointed representatives includes a number of MASG related individuals and whose endorsed projects for energy generation include the Mount Alexander Shire bioenergy plant.



Apparently Council does not seem to understand the concept of “conflict of interest”?

Not surprisingly no-one from the Steering Group or Council is willing to answer the questions we have asked since finding out about it this. Hardly what you would expect from a community initiative. 

However, it now transpires that the Wararack Initiative is a MASG initiated program as evidenced by this extract from MASG’s 2020/21 Annual Report:

“In terms of the channels MASG will use to influence the local community, the Warrarrack Initiative hopefully will prove the most important.“

Expressions of Interest for Class Action against MASG

Update, 28 February 2022

We now have more than sufficient numbers to proceed with a class action so the ball is now firmly in MASG’s court if it wishes to avoid being subject to such action.

Expressions of Interest

for Class Action against

Mount Alexander Sustainability Group

should it proceed with its proposed

Mount Alexander Bioenergy

facility at Don KR in Castlemaine

Please email your contact details in confidence to:

legal@wearecrab.org

MEDIA RELEASE dated 7 December 2021 – Castlemaine Residents Against Biomass (CRAB) campaign goes global (updated)

Castlemaine Residents Against Biomass (CRAB) has received global recognition by joining a world-wide alliance of like-minded organisations who have endorsed the Biomass Delusion Statement on forest biomass energy. We are now working together with a significant number of local, national and international organisations including the Bob Brown Foundation, My Environment, the National Toxics Network, Rainforest Action Network and the John Muir Network by advocating for the protection of the world’s forests as a climate change solution and not burning them for energy.

Our primary focus is still on stopping Mount Alexander Bioenergy’s waste to energy plant proposed to be located at the Don KR Smallgoods site in Castlemaine with no public consultation. The proposal has been developed by Mount Alexander Sustainability Group in agreement with Don KR/George Weston Foods in a highly dubious and secretive manner and we will continue to highlight the destructive impacts of the proposal on our health, safety and well-being.

Many Castlemaine residents will be alarmed to learn that tens of thousands of tonnes of putrid and potentially contaminated industrial and municipal waste will be trucked into town every year from other Shires for processing in a highly hazardous chemical processing facility comprising separate biomass gasification/pyrolysis and anaerobic digester plants. We have recently observed executives from Mount Alexander Bioenergy meeting with senior management from City of Greater Bendigo Council on site and although admitting to this meeting Council has failed to respond to our request for assurance that it does not intend to transfer municipal waste from Bendigo to Castlemaine. The prospect of turning Castlemaine into a dumping ground for Central Victorian waste is complete unacceptable to us. *

During the height of Covid-19 restrictions, 146 local residents and ratepayers of Mount Alexander Shire signed a petition to Council requesting that it follow the lead of the ACT Government by prohibiting biomass plants. In response, Council declined to do so saying that it would require Ministerial approval and that any future permit application will be considered against the requirements of the Mount Alexander Shire Planning Scheme.

Our position was supported by the findings of an independent scientific report by Dr Duncan Rouch which was commissioned by a local resident and recommended the removal of the biomass plant from the proposal. The report also raised concerns about the site location, additional traffic and lack of community consultation.

The only remotely green thing about the green energy that Mount Alexander Bioenergy claims will be produced by the plant is the greenwash used to promote it. The carbon footprint of building, operating and de-commissioning the plant along with the carbon emissions from trucking in tens of thousands of tonnes waste every year is conveniently ignored in MAB’s claimed emissions savings.    

Mount Alexander Bioenergy’s proposal is also at complete odds with the Australian Government’s new recycling campaign, ReMade in Australia. When discussing the need to create an industry for recycled goods within Australia Environment Minister Sussan Ley was quoted as saying “It is not even about burning waste and turning it into energy.”

The onus is now on Mount Alexander Sustainability Group to bring this divisive proposal to an end by keeping its promise to listen to our community when it told us:

“We are a community group and need to have community support for our projects to claim that title. Should we have overwhelming support but a few objections then we would make a decision on whether to press ahead based on the reasonable nature of the objections. We will do all we can to ensure unanimous or at a minimum, majority support.”

The full Biomass Delusion Position Statement and complete list of signatories can be read here:

https://environmentalpaper.org/the-biomass-delusion/

In recognition of our new-found status we have now opened a twitter account where we can be followed:

https://twitter.com/wearecrab

For more information and to subscribe to our mailing list for news updates please visit our website:

https://wearecrab.org

* Update

A subsequent online search reveals that both Mount Alexander Sustainability Group and Mount Alexander Bioenergy have tendered Expressions of Interest with City of Greater Bendigo Council for Circular Economy Solutions for Post-Landfill Region.

We believe this to be for waste from the Council’s kerbside collection which exacerbates our concerns that Castlemaine will be turned into a dumping ground for municipal waste from other Shires. However, we would welcome any evidence to the contrary.

In addition, ECO2Sys Australia Pty Ltd has also tendered its interest. One of its Directors, Deane Belfield, is also a project manager / renewable energy consultant for Mount Alexander Bioenergy as well as being a General Committee Member of Mount Alexander Sustainability Group.

CRAB campaign against biomass goes global

Our campaign against biomass has received global recognition as a result of Castlemaine Residents Against Biomass joining a world-wide alliance of like-minded organisations signing the Biomass Delusion Statement:

“We, the undersigned organisations, believe that we must move beyond burning forest biomass to effectively address climate change. We call on governments, financiers, companies and civil society to avoid expansion of the forest biomass based energy industry and move away from its use. Subsidies for forest biomass energy must be eliminated. Protecting and restoring the world’s forests is a climate change solution, burning them is not.”

The full position statement and complete list of signatories can be read here:

https://environmentalpaper.org/the-biomass-delusion/

In recognition of our new-found status we have now opened a twitter account where you can follow us:

https://twitter.com/wearecrab