Have you heard about the Mount Alexander Bioenergy Plant proposed to be located next to the DON KR Smallgoods site in Castlemaine?
Nether had we until some local neighbours received a flyer for the proposal delivered by hand on 1 June 2021 in the middle of a COVID-19 lockdown inviting them to register for a Zoom meeting only 2 days later on 3 June 2021.
https://wearecrab.org/wp-content/uploads/2021/06/Mount-Alexander-Bioenergy-from-Waste.pdf
The flyer described the proposal as comprising a biodigester system (Anaerobic Digester) with no mention of a biomass heat plant or any potential risks or hazards.
When MASG released details to the media a few days later a biomass thermal heat plant had been quietly added to the proposed facility although the layout didn’t show the stacks, gas flares or woodchipper required for the project:
https://midlandexpress.com.au/environment/2021/06/08/victorian-first-for-waste/
MASG now conveniently claims that the biomass plant was omitted from the original flyer because “it slipped through the editing unnoticed”. Does MASG seriously expect us to believe this especially as we now know that biomass plants are prohibited in the ACT?
We do not have the time or resources to compete with an organisation that has declared investment valued at $762K to develop the proposal to this stage made up of:
- cash grants ($406k) from bodies like ARENA, Victorian Government New Energy Jobs Fund, Mount Alexander Shire, Coliban Water, Don KRC, Sustainability Victoria, MacKinnon Family Foundation, MASG, and a Loddon Mallee Landfill Diversion grant, plus
- in-kind contributions (valued at $356k) from MASG, Don KRC, Coliban Water, Mount Alexander Council.
We are also not technical experts in the field of waste to energy however our own extremely limited research has revealed significant concerns which have not been answered to our satisfaction.
A facility of this kind which combines two hazardous operations on site akin to a chemical processing plant appears to be unprecedented especially in such a sensitive location close to the homes of many residents, our Hospital and residential age care facility, the pony club and Wattle Flat Recreation Reserve.
This facility will need to run 24 hours a day, 7 days a week, 365 days a year.
Has MASG contemplated how this will affect the health and well-being of residents, hospital patients and workers who live and work in close proximity to the proposed site location?
Why should Castlemaine residents have their quality of life diminished and health put at risk so that the DON KR plant can greenwash its environmental credentials by using a carbon accounting loophole that doesn’t count emissions from burning/gasifying wood and provides a convenient way for DON KR to dispose of its own toxic waste?
Why should Castlemaine become a dumping ground for thousands of tonnes of potentially unsorted and contaminated/hazardous waste including human sewage from other Shires?
And what is sustainable about assisting a manufacturer which processes meat from overseas, constantly breaches EPA noise limits, has just been convicted by the Court for pollution, and was responsible for a hazardous ammonia leak in 2019?
Does this sound like a reputable company which MASG says it will not “in anyway damage their reputation.“
How many extra heavy truck loads will rumble through town on return trips delivering up to 150 tonnes of stinking waste on a daily basis and what impact will this have on our road surfaces and the health and safety of other road users, pedestrians etc?
The fanciful documents uploaded and revised several times retrospectively on MAB’s website do not represent the true nature of the extremely limited engagement with neighbours to date.
Will MASG be true to its word and walk away from the proposal in light of objections from the community?
How can MASG claim to be consulting with the community when it says “Another site is a big deal for us as it will mean throwing away a lot of time and money invested over the last 3 or 4 years in the negotiations, analysis and design that is peculiar to this site.”
Does MASG have any professional experience or expertise in the Project Management skills required for a project of such scale and complexity?
Where are the detailed design drawings, specifications, cost plans, health and safety plans, risk analysis registers and other technical information required for such a project?
Has MASG carried out any preliminary site investigations, procured geotechnical and other specialist reports and assessed risks from the possibility of disturbing asbestos and other contaminated/hazardous materials on site?
Who has MASG appointed as the Design Team for the project?
Why can MASG not provide answers to fundamental questions from local residents such as requesting the percentage of the waste materials to be used in the biomass plant replying “as the plant has not yet undertaken the detailed engineering design we do not have the information to answer this question” and “it will be a commercial decision“.
What professional indemnity and public liability insurance cover does MASG hold and will it provide any financial guarantees or security to the community to cover the cost of any accidents or financial burdens on ratepayers arising from the construction, operation and future decommissioning of the facility?
Where is MASG’s Bushfire Management Plan given the site’s location in a designated bushfire prone area?
How can MASG claim that the proposal has been “community led” when it has been developed behind closed doors and only notified to the community once the site has been selected and agreements made with DON KR?
Do all of MASG’s committee members live in Castlemaine or even Mount Alexander Shire?
Can MASG please publicly disclose the full details of its MOU with Mount Alexander Shire Council which it says”gives us access to council officers and a seat at the table to discuss and influence decisions being made by the council with regard to the environment. It also ensures we get access to council facilities for meetings and functions.”
Why is Mount Alexander Shire Council refusing to answer any questions from local residents about the proposal and directing them to MASG which then tells us “We cannot answer for the council.”
How can MASG be taken seriously when it says on the proposed site location “We don’t believe it is close to residences”?
What credibility can be given to the site selection criteria just uploaded by Mount Alexander Bioenergy (MAB) which has site proximity to Castlemaine being listed as a major benefit with a straight 10/10 for the DON KR location with no evaluation of risks or hazards caused by the site’s close proximity to residents’ homes, factory and hospital workers, patients etc?
Why is the likelihood of community support lumped in with political support in the site selection criteria?
Why are such significant risks as the DON KR site being in a designated bushfire prone area ignored in the site selection criteria?
Have the site selection criteria and corresponding weightings been manipulated to suit the required end result?
How can MASG claim that the proposal will reduce carbon emissions in our Shire by 88,500 tonnes per annum when Council’s own Roadmap to Carbon Neutrality shows our annual carbon emissions to be 10,600 tonnes in 2018 reducing to 1,615 tonnes in 2025 without even considering the proposal?
Why is there no independent life cycle assessment of the entire project which would take account of all emissions including those from building, operating and decommission the facility, trucking in waste from other Shires etc?
Why is there no independent Cost Benefit Analysis for the project?
There are bound to be a multitude of other serious risks and hazards associated with a facility of this type which we have not raised to date. We would therefore encourage all potential investors, funders and supporters to carry out their detailed research before committing any more support or funding to the proposal. However, as a starting point for more details we encourage you to read our Key Concerns page which provides some more detail on:
1. Toxic Emissions
2. No Community or Public Consultation
3. Odours
4. Risk of fire, explosion, gas leaks etc.
5. Noise
6. Pollution
7. Heritage Values
8. Reputation
9. Threatened Species