Bioenergy Infrastructure Fund Grants – Funded projects

Number of recipients to date: 4

Total funding awarded to date: $737,000

All projects to be completed by: December 2021

Details of recipients of Bioenergy Infrastructure Fund grants. The grants funded projects that use bioenergy technologies to recover and reprocess organic waste from commercial, industrial and municipal sources.

Mount Alexander Bioenergy

Funding will assist with the pre-construction phase of a proposed bioenergy plant planned at Castlemaine. A Business Case has been completed and is used as a basis for site selection and planning. This phase of the project is intended to reach Financial Close with a selected EPC contractor, regulatory approvals and successful community engagement.

Once commissioned, the facility will process over 22,000 tonnes of organic waste through anaerobic digestion and more than 13,000 tonnes of biomass through a thermal energy facility. Much of the waste will be sourced from commercial and industrial operations.

The project will generate renewable energy sold at commercial rates to Don KRC, behind the meter, for the food processing operation of their Castlemaine plant. This facility will provide an alternative waste processing option for Central Victoria, much of which currently is sent to landfill or facilities in Melbourne.

Funding: $100,000

Mount Alexander Bioenergy provided copies of the following documentation to Sustainability Victoria for the final three milestones of the project : 

  • an Environment Protection Authority Permission Pathways form 
  • a preliminary planning application to Mount Alexander Shire Council and supporting attachments 
  • AQIS (Biosecurity Australia) documentation 
  • an EPC tender document, and 
  • Final project report.

Documents released under FOI are as follows:

Document 1 – Final Project Report

Document 2 – EPA Permission Pathway Form

Document 3 – Council Permit Application (Not Formally Submitted)

Document 4 – Ecology and Biodiversity Assessment

Document 5 – Biosecurity Preliminary Assessment

Document 6 – Civil Engineering Plans

Document 7 – Stormwater Management Report

Document 8 – Traffic Impact Assessment Report

Document 9 – Wastewater Effluent Treatment

Document 10 – Preliminary High Level Design