We encourage you to look at the following resources and links to our key concerns:
Scanned copy of flyer delivered by hand to a few dozen local residents under COVID-19 lockdown on 1 June. The flyer omits to mention the biomass burning facility which is a key component of the facility:
Mount Alexander Bioenergy awarded $100,000 in grant funds from Sustainability Victoria for project to be completed by October 2020:
Funding will assist with the pre-construction phase of a proposed bioenergy plant planned at Castlemaine. A Business Case has been completed and is used as a basis for site selection and planning. This phase of the project is intended to reach Financial Close with a selected EPC contractor, regulatory approvals and successful community engagement.
Once commissioned, the facility will process over 22,000 tonnes of organic waste through anaerobic digestion and more than 13,000 tonnes of biomass through a thermal energy facility. Much of the waste will be sourced from commercial and industrial operations.
The project will generate renewable energy sold at commercial rates to Don KRC, behind the meter, for the food processing operation of their Castlemaine plant. This facility will provide an alternative waste processing option for Central Victoria, much of which currently is sent to landfill or facilities in Melbourne.
Download Sustainability Victoria grant funding documents released under FOI here
Mount Alexander Sustainability Group (MASG) receives $146,000 in grant funds from Australian Government ARENA programme in the 2017/18 financial year:
The Feasibility Study for Integrated Community Waste to Energy project is led by the Mount Alexander Sustainability Group (MASG) to build a community waste to energy facility in Castlemaine, Victoria that would turn locally sourced organic waste into renewable energy.
The organic waste would be sourced from the local Waste Water Treatment Plant (Coliban Water), Don Smallgoods factory and Mount Alexander Shire Council’s aggregated green waste.
https://masg.org.au/wp-content/uploads/2018/11/MASG-2018-annual-report.pdf
MASG is hoping to convert up to 40,000 tonnes of waste per year through the $20 million facility:
and
20 per cent of the organic waste will come from its neighbour DON Smallgoods, while the other 80 per cent will come from other sites in Central Victoria:
https://www.abc.net.au/news/2021-06-07/planned-bioenergy-facility-for-castlemaine/100194430
One likely source of much of the organic waste is Coliban Water, which could provide the digester with biosolids (i.e. treated sewage sludges derived from human faeces) from a wastewater treatment plant:
and
MASG have entered into financial agreements with DON KR and presented the proposal to the media as almost a “done deal” subject to funding before the community was even aware of it:
Biomass Plants prohibited in the ACT under Waste-To-Energy Policy 2020- 2025:
“New facilities, proposing thermal treatment of waste, by means of incineration, gasification, pyrolysis or variations of these for energy recovery, chemical transformation, volume reduction or destruction will not be permitted in the ACT.”
Independent scientific report recommends against the installation of the bioenergy system:
https://www.researchgate.net/publication/354803389_Castlemaine_bioenergy_project
Victorian Government’s Transforming Recycling in Victoria 10-year plan says Victoria should “not become a dumping ground for waste” and that waste to energy should only be considered when other more sustainable options such as recycling and waste minimisation are not possible. The Policy also states that the Victorian Government will only support waste to energy projects where they “create clear net benefits and complement efforts to reduce or recycle waste … and work well with local communities in which they operate.“
https://www.vic.gov.au/transforming-recycling-victoria
The waste hierarchy from the Australian Government’s National Waste Policy shows waste to energy recovery is near the bottom of the preferred options:

https://www.environment.gov.au/protection/waste/publications/national-waste-policy-2018
Energy to Waste: Australia moves on plastics yet falls short in world recycling race:
CRAB joins world-wide alliance of organisations endorsing the Biomass Delusion Statement:

https://environmentalpaper.org/the-biomass-delusion/
Castlemaine locals fight bioenergy project:
https://thefifthestate.com.au/energy-lead/energy/castlemaine-locals-fight-bioenergy-project/
The Recycling Myth – Big Oil’s solution for plastic waste littered with failure:
“Pyrolysis can generate toxic waste, such as dioxins.”
Hideshige Takada, geochemist and professor at the Tokyo University of Agriculture and Technology
https://www.reuters.com/investigates/special-report/environment-plastic-oil-recycling/
Fire, explosion and chemical toxicity hazards of gasification energy from waste, Rollinson, Andrew. (2018):
Scientific research paper shows “a pyrolysis plant for self-sustaining Energy from Waste is thermodynamically unproven, practically implausible, and environmentally unsound.”
https://www.sciencedirect.com/science/article/abs/pii/S0921344918304117?via%3Dihub
Inside Indiana’s ‘Advanced’ Plastics Recycling Plant: Dangerous Vapors, Oil Spills and Life-Threatening Fires:
Zero Waste Australia:
https://zerowasteaustralia.org
National Toxics Network:
Waste to Energy: Greenwash at its Best. (Fact sheet, The Greens):
https://greens.org.au/sites/default/files/2019-09/Waste%20Incinerators%20Fact%20Sheet.pdf
Carbon Loophole: Why Is Wood Burning Counted as Green Energy?:
https://e360.yale.edu/features/carbon-loophole-why-is-wood-burning-counted-as-green-energy
UN forest accounting loophole allows CO2 underreporting by EU, UK, US:
Scientists warn U.S. Congress against declaring biomass burning carbon neutral:
‘Enough with the burning’: EU executive accused of sacrificing forests:
The Millions of Tons of Carbon Emissions That Don’t Officially Exist – How a blind spot in the Kyoto Protocol helped create the biomass industry:
Michael Moore presents Planet of the Humans, a documentary that dares to say what no one else will — that we are losing the battle to stop climate change on planet earth because we are following leaders who have taken us down the wrong road — selling out the green movement to wealthy interests and corporate America. NB It’s the same the world over and the Biomass topic starts at about 52 minutes 30 seconds into the documentary:
Biosolids: mix human waste with toxic chemicals, then spread on crops:
https://www.theguardian.com/environment/2019/oct/05/biosolids-toxic-chemicals-pollution
Bioenergy: The Ugly Truth:
Food Organics Garden Organics (FOGO) Bins – information from Macedon Ranges Shire Council website:
“Communities living near bioenergy plants suffer similarly to those living near a coal plant: with lung problems, asthma and heart issues”:
https://www.oneearth.org/dangerous-delusions-biomass-is-not-a-renewable-energy-source/
What’s The Problem With Bioenergy:
https://www.fern.org/issues/bioenergy/
Potential Hazards Posed By Biogas Plants – ScienceDirect – in the years 1994–2015 the number of accidents in the biogas sector totalled 169, 12% of which can be classed as serious, including several deaths:

https://www.sciencedirect.com/science/article/pii/S1364032120305141
Waste to Energy Plant Process Safety Challenges – these energy plants have hazards more akin to the process industries than the traditional energy industry:
https://www.icheme.org/media/9265/xxii-paper-52.pdf
Two confirmed dead and ‘no hope’ for five missing after blast at German waste incineration site as investigators probe cause:
Four people have died after a chemical tank blast at a waste water treatment works near Bristol, UK:
https://www.mirror.co.uk/news/uk-news/avonmouth-explosion-live-warehouse-bristol-23110121
Hazardous ammonia leak at Don KR Castlemaine site in 2019:
Paris climate agreement overlooks wood pellet loophole:
https://www.greenbiz.com/article/paris-climate-agreement-overlooks-wood-pellet-loophole
Dirty Deception: How the Wood Biomass Industry Skirts the Clean Air Act:
https://www.sec.gov/rules/petitions/2019/ptn4-741-exc.pdf
EU Considering Tighter Biomass Carbon Accounting:
https://cleantechnica.com/2021/06/18/eu-considering-tighter-biomass-carbon-accounting/
Trash Incineration and Climate Change: Debunking EPA Misinformation:

https://www.energyjustice.net/incineration/climate
New international report dated July 2025 finds world’s largest biomass certifier “Sustainable Biomass Program” (SBP) allows forest destruction and rising emissions under the guise of clean energy:
https://forourclimate.org/research/596
New scientific study published 30 July 2025 finds Burning Forest Biomass Is Not an Effective Climate Mitigation Response and Conflicts With Biodiversity Adaptation:
https://rmets.onlinelibrary.wiley.com/doi/10.1002/cli2.70015
SWIFFT – Eltham Copper Butterfly:

https://www.swifft.net.au/cb_pages/sp_eltham_copper_butterfly.php
Improvement Notice issued by EPA to George Weston Foods on 08/02/22 for significantly exceeding noise level limits at Don KR Castlemaine factory site.
NB The compliance date has been extended by four weeks to 28 July 2022 upon a request by the duty holder who “was able to demonstrate to EPA that the factors that lead to the request were beyond their control.”
Following its failure to comply with the above Notice a further Improvement Notice was issued by the EPA to George Weston Foods on 12/10/22 for continuing to significantly exceed noise level limits at the Don KR Castlemaine factory site. This was further amended by the EPA and the final date for compliance extended considerably to 31 October 2023 after a request by the company.
Charges laid against George Weston Foods Ltd by Environment Protection Authority Victoria (EPA) for polluting a creek at the Don KR Castlemaine site have resulted in a conviction for the company and a $100,000 boost for Mount Alexander Sustainability Group (MASG):
George Weston Foods prosecution details 2021:
https://www.epa.vic.gov.au/about-epa/public-registers/court-proceedings/george-weston-foods-limited
Court orders made against George Weston Food for waste discharge into creek and pollution of land at Castlemaine. The Company was ordered to pay the sum of $60,000 to Mt Alexander Sustainability Group Inc for its Pathway to a Sustainable CO2 Future project and fined $10,000 in costs:
FOI correspondence released in March 2022 by the Australian Government – Department of Agriculture, Fisheries and Forestry regarding Mount Alexander Bioenergy seeking approval to dispose of imported pig meat waste through its facility. This correspondence revealed that a “formal legislative approval of a proposed arrangement is not possible until the facility is built and audited for compliance with the conditions of the proposed arrangement“.
https://www.agriculture.gov.au/about/reporting/freedom-of-information/disclosure-log
https://www.agriculture.gov.au/sites/default/files/documents/25511.pdf
Castlemaine Botanical Gardens Victorian Heritage Register listing:
https://vhd.heritage.vic.gov.au/places/result_detail/1791
Destination Castlemaine:
https://www.visitmelbourne.com/Regions/Goldfields/Destinations/Castlemaine

